Home Guides Campus and buildings guides On this page Chevron pointing down Guide Guide to building closures due to Reinforced Autoclaved Aerated Concrete Parts of DUSA, the Fulton Building (School of Science and Engineering), and Crawford Building (DJCAD) are temporarily closed as a precautionary measure due to RAAC concrete within their roofs. Guide Register on Contractor Tracker if you are a contractor Find out what you need to do if you are working on campus as a contractor and register on our Contractor Tracker system. Guide Request repairs to a University building or part of campus How to report an issue with a room, building, or the external environment of the University campus. Guide What equipment is available in a centrally-managed teaching room? This is an overview of the type of equipment available in our bookable rooms
Guide Guide to building closures due to Reinforced Autoclaved Aerated Concrete Parts of DUSA, the Fulton Building (School of Science and Engineering), and Crawford Building (DJCAD) are temporarily closed as a precautionary measure due to RAAC concrete within their roofs.
Guide Register on Contractor Tracker if you are a contractor Find out what you need to do if you are working on campus as a contractor and register on our Contractor Tracker system.
Guide Request repairs to a University building or part of campus How to report an issue with a room, building, or the external environment of the University campus.
Guide What equipment is available in a centrally-managed teaching room? This is an overview of the type of equipment available in our bookable rooms